let's talk

Rebuilt in Order

A redesign can make a site look better and still lose half its leads. It happens when the new design is planned before anyone checks what the old one was doing right.

The order of the work decides the outcome more than the design does.

Here are the seven steps we follow on every redesign, and what each one protects.

Website redesign process: the seven steps

1. Audit what works. Before any design, pull the pages that bring traffic, leads and sales, and the search queries they rank for. These pages are the redesign's constraints, not its raw material.

2. Define the one job. What should a visitor do, and what do they need to believe first? Write it as one sentence. Every page in the new site answers to it.

3. Plan the structure. Decide the pages, the navigation and the content model, including what moves into a CMS so the team can edit it without a developer.

4. Design the key screens in Figma, starting with the first screen of the homepage and the page that converts. Approve those before designing everything else.

5. Build, responsive from the start: every breakpoint checked on real phones, not only in a browser window.

6. Map every URL. Old address on the left, new one on the right, for every page that returns content. This step decides whether the traffic survives; it is covered in detail in moving without losing rankings.

7. Launch and watch. Redirects live before the switch, sitemap resubmitted, search coverage checked weekly for the first month.

The step most redesigns skip

Step one. A team tired of its site wants to start designing, and the audit feels like delay. It is the opposite: it tells you which pages must keep their address and their message, and it is the cheapest way to avoid a redesign that loses traffic.

The second most skipped is step six, for the same reason. A spreadsheet of URLs is boring, and it is the only line item that protects revenue the site already earns.

How long a redesign takes

For a marketing site of up to a dozen pages, about three weeks is realistic once the content and decisions are ready; we deliver most of ours in that window. Larger sites, a second language or a migration between platforms add time.

What stretches a redesign is rarely the build. It is waiting for copy, a second decision-maker joining late, and pages added after design approval. Naming the scope precisely is what keeps the date. The cost side is in what a rebuild costs.

A homepage that became the proof

For Imperium Completions, the redesign question was simple: a company that sells digital transformation cannot have a homepage that only describes it.

So the homepage stopped describing the work and started demonstrating it, with a video preloader, a story told in three steps and a contact form split into short stages. The audit came first; the motion came after it was clear what the page had to prove.

Questions we get asked

What are the steps of a website redesign?

Audit what already works, define the site's one job, plan the structure and content model, design the key screens, build responsively, map every old URL to a new one, then launch and monitor search coverage for a month.

How do I redesign a website without losing SEO?

Keep the addresses of pages that rank, redirect every URL that changes to its closest new equivalent, carry over titles and descriptions, set the redirects before launch, and watch search coverage for the first few weeks.

How long does a website redesign take?

About three weeks for a marketing site of up to a dozen pages once content is ready; longer for large sites, multiple languages or a platform migration.

Should I redesign or rebuild my website from scratch?

If the structure and content work and only the look is dated, a redesign is enough. If the site is hard to edit, slow or on a platform you have outgrown, it is usually a rebuild. See signs your website needs a redesign.

Get a free
audit of your
website

Speed

SEO

Animation

Design

Conversion

get my free audit
Get my website
View: ReferencesReferences

You

Click

Drag